• +877-739-9120
A crane is lifting a building into the air.

Tampa Electric Company

The Challenge

Tampa Electric needed a facility that would accommodate their engineering and construction staff for an extended period during the reproduction of Gannon Station. The buildings had to be aesthetically pleasing, cost effective and functional. The buildings had to meet all of the expectations of quality and durability as their other “stick-built” facilities.

Project Profile

  • Who: Tampa Electric Company
  • Where: Tampa, Florida
  • What: Buildings designed to present a clean, low maintenance aesthetic appearance
  • Size: 5,184 Square Feet
  • Scope: Buildings include (16) private offices, (2) conference areas, break area, restrooms, (10) workstations for staff, and (2) reception areas

The Solution

Affordable Structures worked closely with Tampa Electric engineers and purchasing department to design a facility that met all of their expectations for both cost and speed. The end result was (2) buildings that came in at budget and ahead of schedule.

Project Features

  • Aluminum sided exterior with decorative mansard
  • Adjoining deck with covered canopy
  • Prefinished ceiling with upgraded diffused lighting package
  • Commercial grade carpeting and vinyl composition floor tile
  • Central air conditioning and heat