• +877-739-9120

Central Oil

The Challenge

Central Oil wanted a building that matched the quality and appearance of stick-built construction, but needed it faster than was possible with conventional methods. The project also had to meet the demanding requirements and approvals of the local owners and come in at reduced costs

Project Profile

  • Who: Central Oil – Executive Offices
  • Where: Tampa, Florida
  • What: Designed and built to project a permanent appearance with accelerated construction
  • Size: 5,200 Square Feet
  • Scope: Building contains administrative offices, conference rooms, clerical areas and kitchen for staff

The Solution

Through standardized manufacturing and construction processes, the design-build company achieved the development of a single-story permanent, relocatable building at substantial savings over conventional construction. The building is relocatable for future applications and meet all expectations for quality and attractiveness.

Project Features

  • Hardi-panel exterior
  • Extended box mansard with concealed gutters
  • Permanent foundation with crawl space
  • Colonial windows with decorative awnings
  • Central air