• +877-739-9120
A bunch of seats in the middle of a room

First Baptist Central Florida

The Challenge

First Baptist of Central Florida needed a new educational facility to accommodate rapidly increasing student enrollment. The building committee considered both stick-built and modular for time and cost considerations. The building had to be ready for occupancy prior to the start of school and had to match the look and functionality of the existing church.

Project Profile

  • Who: First Baptist Central Florida
  • Where: Ocoee, Florida
  • What: Building includes classrooms, choir room, teachers’ lounge and offices
  • Size: 18,364 Square Feet
  • Scope: Designed and built to match the aesthetics of the existing church

The Solution

Affordable Structures worked closely with the building committee, pastor and educational staff to design a building that met all of their expectations and came in ahead of schedule. The result was a beautiful permanent educational complex the met all of their needs.

Project Features

  • Stucco exterior with decorative mansard
  • Permanent foundation with crawl space
  • Roof mount packaged HVAC system
  • Full fire suppression and alarm
  • Double insulated glass windows with bronze frame and tinted glass